97精品视频在线观看,国语精品91自产拍在线观看二区,久久久久久久久99,av色欲无码人妻中文字幕

+
  • undefined
  • undefined

Radiator wind tunnel test bench (double air chamber)

Keyword:

Detail

overview

This radiator performance wind tunnel test bench is suitable for the heat dissipation performance test of radiators of automobiles, tractors and construction machinery engines. This test bench integrates the performance test of water radiator, warm air water tank, air-cooled oil radiator and intercooler.

Design thinking

Combined with the current development trend and demand of various automotive cooling systems, using advanced design ideas and high-precision, high-stability test instruments, adopting more realistic test methods, simulating the road test conditions of the whole vehicle from the perspective of testing, so as to adapt it to the performance test of a variety of automotive heat exchangers. Its purpose is to provide a practical basis for the design and improvement of heat exchangers.

Design principles

(1) Practicality: It is mainly used for the performance test of a variety of automotive radiators.

(2) Reliability: Fully consider the impact of ambient temperature, humidity, electromagnetic interference and other factors on the equipment, therefore, the measurement and control system (PLC) is selected from international famous brands to ensure long-term, stable and reliable operation of the system.

(3) Expandability: The PLC system can add functional modules at any time as needed. On the one hand, new devices can be quickly added; On the other hand, it allows users to carry out secondary development.

(4) Safety: The power supply and grounding of the electrical system are treated accordingly to ensure the safety of personnel.

(5) Intelligence: The design of the system maximizes the degree of intelligence and minimizes manual intervention.

(6) Easy operation: the man-machine interface of the upper computer is beautiful and generous, and the operation is simple.

(7) Easy maintenance: mechanical and electrical equipment are selected from domestic and foreign general products to ensure convenient system maintenance.

 

 How the experiment works

  1. Rationale

When the air supplied by the wind tunnel system flows through the heat exchanger and the heat exchange fluid inside it (the heat carrier radiator parts), the air absorbs the heat released by the heat carrier.

When the heat exchange process meets the requirements of the heat balance index, the measurement system automatically collects various physical quantity data.

  2. Control of each physical quantity in the process

    The lower PLC system automatically adjusts the speed of the motor and the opening degree of the bypass electric valve through closed-loop control, so as to achieve accurate control of the flow of hot medium.

    The heating power of the heating device is automatically adjusted by the dynamometer to keep the medium temperature constant.

The wind tunnel speed regulation system automatically adjusts the fan speed to stabilize the wind speed within the indicators required by the test conditions.

  3. Data Processing

    Through the upper computer, the various physical quantities collected in the above process are calculated according to the principles and methods of heat transfer and heat exchanger thermal calculation, so as to calculate the heat absorption and heat release, and sort out the corresponding heat transfer coefficient and other results.

    In order to improve the accuracy of air mass flow, the calculation of air density and air specific heat also takes into account the influence of atmospheric pressure and humidity.

The result of data processing is in a form that meets the requirements of the relevant standards.

Main functions and features:

1. Select domestic high-quality fan, the fan is driven by imported frequency converter, stepless speed regulation, stable operation, significant energy saving; Cross-sectional wind measuring device is used to measure wind speed; The measurement accuracy is more accurate.

2. The flow rate of circulating water is regulated and controlled by imported frequency converter (PID), the flow adjustment is rapid, the flow rate is accurate, and it is suitable for specimens of different specifications and models;

3. Gas and water (oil) measurement adopts modular structure, synchronous measurement, no time lag;

4. Inlet and outlet air temperature collection mode: establish temperature field, high measurement accuracy;

5. Choose WIN CC configuration software as the development environment, friendly man-machine interface, beautiful and generous screen;

6. High degree of automation, reduce the impact of human operation on test accuracy, and reduce the degree of manual participation;

7. In order to ensure the principle of system reliability, system advancedness, good repeatability and upgradeability, all primary instruments are selected from the more advanced and vigorous mainstream products on the market, which cannot be eliminated in the past 20 years.

 

Related product

Inquiry


Copyright Shenyang Huizhi Precision Machinery Co., Ltd All rights reserved

Powered by 300.cn Shenyang

安仁县| 平乡县| 大丰市| 台安县| 定兴县| 南召县| 波密县| 星子县| 肥乡县| 呼伦贝尔市| 泗水县| 博野县| 淮滨县| 蛟河市| 阳谷县| 太原市| 祁连县| 珠海市| 竹溪县| 厦门市| 山东省| 财经| 新密市| 来宾市| 永福县| 忻州市| 张掖市| 延长县| 桐乡市| 中西区| 南召县| 平邑县| 腾冲县| 龙口市| 玉林市| 莱阳市| 罗江县| 双鸭山市| 青阳县| 合水县| 合肥市|